Industrial Logistics Park Retention & Drainage Basin — 2× 20T Excavator Package
420m monsoon channel excavation, reinforced slab demolition via hydraulic breaker, and 1:1.5 retention embankment profiling.
Blocked perimeter drainage with heavy silt accumulation, buried reinforced concrete footings, and standing water halting dump-truck access.
Drainage channel and compacted earthwork platform completed to survey invert levels within 14 days with zero utility strikes.
Tonnage Range
3T Mini, 5T, 12T, 20T & 30T Hydraulic
Attachments
Standard Bucket, 15m Long-Arm, Hydraulic Breaker
Operator & Compliance
Competent Operator + CIDB Green Card
Uptime SLA
On-site mechanic support & rapid standby replacement